How to Re-Seal Your Shower (Step by Step)
β± 8 min read Β· June 8, 2025
2025 pricing for bathroom renovations across Queensland β from a basic refresh to a luxury master ensuite. We've surveyed dozens of licensed tradies to give you real numbers, not vague estimates.
This covers re-siliconing, re-grouting, replacing a vanity, new tapware, and a toilet. No structural changes, no new tiling. Great for investment properties or pre-sale preparation. 3β5 day turnaround.
Full strip-out, new waterproofing, new floor and wall tiles (standard range), new vanity and toilet, frameless shower screen, and new tapware. Most family bathrooms fall into this range. 2β4 week project.
Large format tiles, feature tile walls, freestanding bath, floor-to-ceiling tiling, premium tapware and fixtures, custom vanity, underfloor heating, and designer finishes. 4β8 week project.
High-end stone, custom joinery, rainhead shower, heated towel rails, smart mirror, dual vanity, freestanding bath, and premium imported fixtures. These projects can run 10β14 weeks with the right tradie.
Access issues (e.g. upper floor with no direct access), wet area compliance fails, asbestos removal (pre-1990 homes), structural changes, imported or custom materials, and tight project timelines all increase cost significantly.
Don't compromise on waterproofing β this is where failures happen. Do save on fixtures by choosing quality mid-range brands (e.g. Caroma, Methven, Kado) rather than imported designer pieces. Buy your own tiles after getting a quote β retail markup is significant.