Home>Tools>Bathroom Planner

Professional Bathroom Renovation Planner

Formulate a professional construction schedule & takeoff list under AS 3740 / AS 1288 rules.

Quick Size Templates
2.7m
ESTIMATED CONSTRUCTION COST$25,076 AUD

Calculated using 2026 QLD building award labor indexes. Includes itemized fixtures, Form 16 certification sign-off, GST, and builder margin (18%).

Interactive 2D Room Blueprint

3.00m2.00mSHOWERVANITY (900mm)WC
Dynamic visual representation of the selected floor footprint.

✦ Contractor Briefing & Communication Guide

Use these tailor-made questions based on your specifications (3.0m x 2.0m room with a frameless shower & 600x600 porcelain tiles) to communicate clearly with your trade specialists.

Plumbing Briefing:"We have planned 3 plumbing outlets with a mixertapware layout. Are we keeping the existing drainage points, or will we need to chase the concrete slab to accommodate the new walk-in shower?"
Tiling Briefing:"I've specified 600x600 porcelain tiles in a stacked pattern. What is your labor surcharge for the stackedlayout, and do we need self-leveling spacers to prevent lippage?"
Waterproofing Briefing:"Since this is a Class III Liquid Polyurethanemembrane application, do you supply the QBCC Form 16 immediately upon curing, before tiling screed is laid?"
Electrical Briefing:"We are planning 2 GPOs and a standard fixture. Does our bathroom ventilation capacity meet NCC rules for damp environments?"

✦ AS 3740 Waterproofing & Compliance Notes

  • Bond Breakers: Mandatory flexible band breakers must seal wall-to-floor and wall-to-wall joints.
  • Shower Walls: Waterproof membrane must extend at least 150mm above the shower floor.
  • AS 1288 Safety Glass: Shower screens must consist of certified toughened safety glass (minimum 10mm thickness for frameless panels).
  • Form 16: The installer must sign and hand you a Form 16 Certificate of Inspection to submit to your certifier.